Glug Glug Glug - Plumbed in water coolers, now that's smart thinking
Plumbed in Water Coolers
Plumbed in Water Coolers


European Point-of-use Water  Association

European Point-of-use Water  Association Accredited Supplier

Water Regulations Advisory Scheme Approved Product

Print this page |
plumbed in water coolers
Installation

Installation is quick and simple, only carried out by professional Glug Glug Glug engineers, qualified to EPDWA standards.

Installation requirements:
• Mains fed water supply
• 240V Electrical socket
• Waste drainage (only required for water fountains)
• Sink area (only required for water boilers)

Installation Equipment:

These items are fitted as standard on all installations as per requirements of the EPDWA...
• Isolator Shut Off Valve – this is used to isolate the water before reaching the install rail
• Water Pressure Regulator – helps reduce any irregular water pressure

For added insurance and peace-of-mind...
• Water Block – in the unlikely event of a leak, this is set to allow only a certain amount of water through before shutting off the water supply to the machine. This also acts as a non-return valve
• Reset Trigger – our water blocks have these as standard allowing instant reset in the event of an accidental excess flow of water
• Cooler Isolator Tap – Each cooler has its own cooler isolator tap, this will be found on the rear of the cooler.

Contact us today to find out how much we can save you.

Water Coolers | Premier Range | Water Boilers | Water Fountains | Schools and Gyms | Installation | Filters | Why Bottleless Water Coolers? | Why Glug Glug Glug? | Environmental Benefits | Links | Contact Us

Installation carried out by professional engineers
Installation is carried out by professional engineers
© 2008 Glug Glug Glug Call us on 0870 403 1341 for a quote