Call us today
Water Fountains
Water Coolers
Water Boilers

Installation Requirements

Installation is quick and simple, only carried out by professional Glug Glug Glug engineers, qualified to EPDWA standards.

Installation requirements

• Mains fed water supply
• 240V Electrical socket
• Waste drainage (only required for water fountains)
• Sink area (only required for water boilers)


Installation Equipment

These items are fitted as standard on all installations as per requirements of the EPDWA...

• Isolator Shut Off Valve – this is used to isolate the water before reaching the install rail
• Water Pressure Regulator – helps reduce any irregular water pressure


For added assurance and peace-of-mind...

• Water Block – in the unlikely event of a leak, this is set to allow only a certain amount of water through before shutting off the water supply to the machine. This also acts as a non-return valve

• Reset Trigger – our water blocks have these as standard allowing instant reset in the event of an accidental excess flow of water

• Cooler Isolator Tap – Each cooler has its own cooler isolator tap, this will be found on the rear of the cooler.

Contact us today to find out how much we can save you.