Installation Requirements
Installation is quick and simple, only carried out by professional Glug Glug Glug engineers, qualified to EPDWA standards.
Installation requirements
• Mains fed water supply
• 240V Electrical socket
• Waste drainage (only required for water fountains)
• Sink area (only required for water boilers)
Installation Equipment
These items are fitted as standard on all installations as per requirements of the EPDWA...
• Isolator Shut Off Valve – this is used to isolate the water before reaching the install rail
• Water Pressure Regulator – helps reduce any irregular water pressure
For added assurance and peace-of-mind...
• Water Block – in the unlikely event of a leak, this is set to allow only a certain amount of water through before shutting off the water supply to the machine. This also acts as a non-return valve
• Reset Trigger – our water blocks have these as standard allowing instant reset in the event of an accidental excess flow of water
• Cooler Isolator Tap – Each cooler has its own cooler isolator tap, this will be found on the rear of the cooler.
Contact us today to find out how much we can save you.







